Article 71 – Symmetric measures for transition to fibre
Commission proposal 21 January 2026 · COM(2026) 16 final
- 1.
The national regulatory authority shall impose on a provider deploying a fibre-to-the-home (FTTH) network in the area where the copper switch-off has been mandated the obligation to connect, upon user’s request, households passed by its fibre network. Where more than one provider is present in the area, the national regulatory authority may impose such obligations on only one of the providers, based on transparent, proportionate and non-discriminatory criteria.
- 2.
In the market analysis carried out pursuant to Article 73(1) in the context of the copper switch-off, the national regulatory authority shall define the conditions for the access obligations, including the cost recovery calculation, as needed.
- 3.
Where the national regulatory authority concludes that the costs exceed a normal connection fee and that an additional connection fee may be justified, it shall ensure that such additional fee, when borne by end users, is fair and reasonable. The national regulatory authority may decide to set maximum level of connection fees to be paid by end-users.
- 4.
In the areas where the copper switch-off has been mandated, where the connection of households requires providers of electronic communications networks to deploy new fibre wiring and cables and associated facilities inside a multi-dwelling unit, the owner or the administrator of such multi-dwelling unit shall allow such deployment at the request of any resident of the multi-dwelling unit.
- 5.
The obligation to allow the deployment of fibre wiring and cables and associated facilities inside a multi-dwelling unit shall be considered to be fulfilled once a single provider of electronic communications networks has deployed the network. National regulatory authority shall impose measures under Article 68(1) and Article 69 where needed to ensure effective access by other providers of electronic communications networks to the new fibre wiring and cables and associated facilities.
- 6.
The national regulatory authority may request any other provider of electronic communications networks to proceed with such deployment where the provider of electronic communications networks which has passed the multi-dwelling unit provides substantiated justification proving the impossibility to comply with this obligation.
Parliament amendments
ITRE draft report 20 October 2026
386 ~Alternative Michał KoboskoRapporteur · ITRE “Without prejudice to Article 77, the national regulatory authority may impose, where there is no other existing connection to the end user, on any…” Article 71 – paragraph 1
Text proposed by the Commission
1.The national regulatory authority shall impose on a provider deploying a fibre-to-the-home (FTTH) network in the area where the copper switch-off has been mandated the obligation to connect, upon user’s request, households passed by its fibre network. Where more than one provider is present in the area, the national regulatory authority may impose such obligations on only one of the providers, based on transparent, proportionate and non-discriminatory criteria.
Amendment
1.Without prejudice to Article 77 , the national regulatory authority may impose, where there is no other existing connection to the end user, on any provider deploying a fibre-to-the-home (FTTH) network the obligation to connect households passed by its fibre network, upon user’s request.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 256
- Printed header
- Article 71 – paragraph 1
387 +Addition Michał KoboskoRapporteur · ITRE “In the area where the copper switch off has been mandated, and where there is no other existing connection to the end user, the national regulatory…” Article 71 – paragraph 1 a (new)
Text proposed by the Commission
Nothing printed in this column.
Amendment
1a.In the area where the copper switch off has been mandated, and where there is no other existing connection to the end user, the national regulatory authority shall impose on a provider deploying a fibre-to-the-home (FTTH) network the obligation to connect households passed by its fibre network, upon user’s request.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 256
- Printed header
- Article 71 – paragraph 1 a (new)
388 +Addition Michał KoboskoRapporteur · ITRE “Where the household is passed by more than one provider, the national regulatory authority may impose such obligation on only one of the providers…” Article 71 – paragraph 1 b (new)
Text proposed by the Commission
Nothing printed in this column.
Amendment
1b.Where the household is passed by more than one provider, the national regulatory authority may impose such obligation on only one of the providers, based on transparent, proportionate and non-discriminatory criteria. Where the selected provider provides substantiated justification proving the inability to comply with this obligation, based on transparent, proportionate and non-discriminatory criteria, the national regulatory authority may oblige another provider of electronic communications networks passing the same household, to proceed with such deployment.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 257
- Printed header
- Article 71 – paragraph 1 b (new)
389 ~Alternative Michał KoboskoRapporteur · ITRE “The national regulatory authority shall define the conditions for the access obligations, including the cost recovery calculation, if needed as a…” Article 71 – paragraph 2
Text proposed by the Commission
2.In the market analysis carried out pursuant to Article 73(1) in the context of the copper switch-off, the national regulatory authority shall define the conditions for the access obligations, including the cost recovery calculation, as needed.
Amendment
2.The national regulatory authority shall define the conditions for the access obligations, including the cost recovery calculation, if needed as a result of the market analysis carried out pursuant to Article 73(1) in the context of the copper switch-off.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 257
- Printed header
- Article 71 – paragraph 2
390 ~Alternative Michał KoboskoRapporteur · ITRE “Where the national regulatory authority concludes that the costs of the connection exceed the connection fees normally applicable in the concerned…” Article 71 – paragraph 3
Text proposed by the Commission
3.Where the national regulatory authority concludes that the costs exceed a normal connection fee and that an additional connection fee may be justified, it shall ensure that such additional fee, when borne by end users, is fair and reasonable. The national regulatory authority may decide to set maximum level of connection fees to be paid by end-users.
Amendment
3.Where the national regulatory authority concludes that the costs of the connection exceed the connection fees normally applicable in the concerned area and that an additional connection fee may be justified, it shall ensure that such additional fee, when borne by end-users, is fair and reasonable. The national regulatory authority may decide to set maximum level of connection fees to be paid by end-users.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 258
- Printed header
- Article 71 – paragraph 3
391 ~Alternative Michał KoboskoRapporteur · ITRE “Where the connection of households requires providers of electronic communications networks to deploy new fibre wiring and cables and associated…” Article 71 – paragraph 4
Text proposed by the Commission
4.In the areas where the copper switch-off has been mandated, where the connection of households requires providers of electronic communications networks to deploy new fibre wiring and cables and associated facilities inside a multi-dwelling unit, the owner or the administrator of such multi-dwelling unit shall allow such deployment at the request of any resident of the multi-dwelling unit.
Amendment
4.Where the connection of households requires providers of electronic communications networks to deploy new fibre wiring and cables and associated facilities inside a multi-dwelling unit, the owner or the administrator of such multi-dwelling unit shall allow such deployment at the request of any resident of the multi-dwelling unit.
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Source
- Official text, page 258
- Printed header
- Article 71 – paragraph 4
392 −Deletion Michał KoboskoRapporteur · ITRE Deletes the Commission’s wording Article 71 – paragraph 6
Text proposed by the Commission
6.The national regulatory authority may request any other provider of electronic communications networks to proceed with such deployment where the provider of electronic communications networks which has passed the multi-dwelling unit provides substantiated justification proving the impossibility to comply with this obligation.
Amendment
deleted
- Rapporteur
- Michał Kobosko
- Group
- Rapporteur
- Targets
- Article 71
- Document
- ITRE draft report
- Printed header
- Article 71 – paragraph 6