Article 63 – Rights of way

Part V
Transition to fibre, markets functioning and competition
Title II
Access to land

Commission proposal 21 January 2026 · COM(2026) 16 final

  1. 1.

    Where a competent authority considers an application for the granting of any of the following rights, it shall apply paragraph 2:

    1. (a)

      the right to install facilities on, over or under public or private property to an undertaking authorised to provide public electronic communications networks;

    2. (b)

      the right to install facilities on, over or under public property to an undertaking authorised to provide electronic communications networks other than to the public.

  2. 2.

    For the purposes of paragraph 1, the competent authority shall:

    1. (a)

      act on the basis of simple, efficient, transparent and publicly available procedures, applied without discrimination and without delay, and in any event make its decision within six months of the application, except in the case of expropriation;

    2. (b)

      follow the principles of transparency and non-discrimination in attaching conditions to any such rights.

    The procedures referred to in the first subparagraph, point (a), may differ depending on whether the applicant is providing public electronic communications networks or not.

  3. 3.

    Where public or local authorities retain ownership or control of undertakings providing public electronic communications networks or publicly available electronic communications services, there shall be an effective structural separation of the function responsible for granting the rights referred to in paragraph 1 from the activities associated with ownership or control.

Parliament amendments

ITRE draft report 20 October 2026

  1. 377 Addition Michał KoboskoRapporteur · ITRE “Member States shall ensure that requests for connection to the electricity grid for the purpose of operating electronic communications networks or…” Article 63 – paragraph 3 a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    3a.Member States shall ensure that requests for connection to the electricity grid for the purpose of operating electronic communications networks or associated facilities are processed without undue delay and with priority. Member States shall further ensure that undertakings referred to in paragraph 1 and operators of associated facilities as defined in Article 2(13) are provided, within one month of submitting a request, with information on the nearest technically suitable connection points to the electricity grid for the site identified by the requesting undertaking, together with a transparent estimate of the costs and timeline for the grid connection.

    Rapporteur
    Michał Kobosko
    Group
    Rapporteur
    Targets
    Article 63
    Document
    ITRE draft report
    Printed header
    Article 63 – paragraph 3 a (new)