ITRE Amendment 90

Recital 161 a (new)

Document
ITRE draft report
Rapporteur
Michał Kobosko
  1. 90 Addition Michał KoboskoRapporteur · ITRE “The deployment and operation of electronic communications networks and associated facilities depend on timely access to the electricity grid. Member…” Recital 161 a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    (161a)The deployment and operation of electronic communications networks and associated facilities depend on timely access to the electricity grid. Member States should therefore ensure that requests for connection to the electricity grid for the purpose of operating electronic communications networks or associated facilities are processed without undue delay and with priority, and that the requesting undertakings and operators of associated facilities are provided, within one month of submitting a request, with information on the nearest technically suitable connection points to the electricity grid for the site concerned, together with a transparent estimate of the costs and timeline for the grid connection.

    Rapporteur
    Michał Kobosko
    Group
    Rapporteur
    Document
    ITRE draft report
    Printed header
    Recital 161 a (new)

Cite

Amendment 90 (draft report by Michał Kobosko), European Parliament, Committee on Industry, Research and Energy, draft report on COM(2026) 16 (ITRE-PR-791994, PE791.994v02-00, 20 October 2026), p. 75

https://research.eutechreg.com/trackers/digital-networks-act/amendments/itre-90/