ITRE–IMCO Amendment 158

Article 15 – paragraph 1 – point c a (new)

Document
ITRE–IMCO draft report
Rapporteurs
Diego Solier and Reinier Van Lanschot
  1. 158 Addition Diego Solier +1Rapporteurs · ITRE–IMCO “the electricity consumption, peak demand, load profiles, electricity sourcing, including on-site and behind-the-meter generation and the fuels used…” Article 15 – paragraph 1 – point c a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    (ca)the electricity consumption, peak demand, load profiles, electricity sourcing, including on-site and behind-the-meter generation and the fuels used, direct operational emissions, grid impact, water use, embodied emissions, hardware turnover, material requirements and expected workload growth associated with cloud, Al and data centre infrastructures, including infrastructures benefitting from public support, accelerated procedures or strategic status;

    Rapporteurs
    Diego Solier and Reinier Van Lanschot
    Group
    Rapporteurs
    Targets
    Article 15
    Document
    ITRE–IMCO draft report
    Printed header
    Article 15 – paragraph 1 – point c a (new)

Cite

Amendment 158 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), p. 105

https://research.eutechreg.com/trackers/cada/amendments/itre-imco-158/