ITRE–IMCO Amendment 143

Article 13 – paragraph 5 a (new)

Document
ITRE–IMCO draft report
Rapporteurs
Diego Solier and Reinier Van Lanschot
  1. 143 Addition Diego Solier +1Rapporteurs · ITRE–IMCO “The permit-granting procedure and the time limit referred to in paragraph 5 shall also cover the permits required for additional renewable…” Article 13 – paragraph 5 a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    5a.The permit-granting procedure and the time limit referred to in paragraph 5 shall also cover the permits required for additional renewable electricity generation and energy storage facilities that are co-located with, or located in proximity to, a data centre project deployed in an acceleration zone and intended to supply that project, and for the direct lines within the meaning of Article 2, point (41) of Directive (EU) 2019/944 connecting those facilities to the project, including where they serve as a bridging source of power pending connection to the electricity grid.

    Rapporteurs
    Diego Solier and Reinier Van Lanschot
    Group
    Rapporteurs
    Targets
    Article 13
    Document
    ITRE–IMCO draft report
    Printed header
    Article 13 – paragraph 5 a (new)

Cite

Amendment 143 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), p. 98

https://research.eutechreg.com/trackers/cada/amendments/itre-imco-143/