ITRE–IMCO Amendment 125

Article 11 – paragraph 2 a (new)

Document
ITRE–IMCO draft report
Rapporteurs
Diego Solier and Reinier Van Lanschot
  1. 125 Addition Diego Solier +1Rapporteurs · ITRE–IMCO “Member States shall ensure that, in each acceleration zone, data centre operators established in the Union that are not controlled, directly or…” Article 11 – paragraph 2 a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    2a.Member States shall ensure that, in each acceleration zone, data centre operators established in the Union that are not controlled, directly or indirectly, by a third country or a third-country entity, benefit from the following:

    a)for [60] days from the publication of the designation, only Union operators may submit expressions of interest, stating their control structure, the land area and grid connection capacity sought, and an indicative timeline;

    b)each such expression of interest shall confer priority in the allocation of the land area and grid connection capacity it indicates, provided that the operator submits a comprehensive application under Article 13 within [4] months of the expiry of the period referred to in point (a); otherwise, the priority shall lapse;

    c)where the acceleration zone exceeds [2] hectares, at least 30 % of its land area and grid connection capacity shall remain reserved for Union operators for one year from the publication of the designation. Capacity allocated under point (b) shall count towards that share.

    Capacity not allocated under this paragraph shall be allocated in accordance with paragraph 2.

    Rapporteurs
    Diego Solier and Reinier Van Lanschot
    Group
    Rapporteurs
    Targets
    Article 11
    Document
    ITRE–IMCO draft report
    Printed header
    Article 11 – paragraph 2 a (new)

Cite

Amendment 125 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), pp. 89–90

https://research.eutechreg.com/trackers/cada/amendments/itre-imco-125/