ITRE–IMCO Amendment 11

Recital 41

Document
ITRE–IMCO draft report
Rapporteurs
Diego Solier and Reinier Van Lanschot
  1. 11 Alternative Diego Solier +1Rapporteurs · ITRE–IMCO “Regulation (EU) 202X/XXX [on speeding-up environmental assessments] (²⁷) establishes a common acceleration framework for environmental assessments to…” Recital 41

    Text proposed by the Commission

    (41)Regulation (EU) 202X/XXX [on speeding-up environmental assessments] (²⁷) establishes a common acceleration framework for environmental assessments to boost the Union’s roll-out of key technologies, reduce dependencies and increase competitiveness. Procedures linked to environmental assessments should be accelerated and streamlined for plans, programmes and projects across all sectors of the economy while maintaining high levels of protection of human health and the environment. Some sectors may, however, require faster environmental assessments. To ensure the coherence of the legal framework for environmental assessments, while accommodating the need for accelerated deployment in certain strategic sectors, Regulation (EU) 202X/XXX [on speeding-up environmental assessments] establishes a dedicated toolbox. Given their role in ensuring the achievement of the Union’s climate and environmental objectives through their contribution to improving energy efficiency, enabling clean energy integration, and providing the infrastructure needed for smarter grids, transport systems, and low-carbon technologies, and their contribution to the Union’s resilience and economic security by ensuring reliable infrastructure in the Union to protect critical services and strengthening the Union’s capacity to operate independently, data centre projects deployed in acceleration zones should be considered strategic projects within the meaning of Regulation (EU) 202X/XXX [on speeding-up environmental assessments] and therefore benefit from the dedicated toolbox established under that Regulation. Member States should establish an aggregated baseline permit reflecting the specific characteristics of each identified acceleration zone. That aggregated baseline permit issued by public authorities should cover the permits commonly required for such activities within the area, excluding the grid connection permits.

    27 Add reference to the Regulation on speeding-up environmental assessments once adopted. See Commission proposal COM(2025) 984 final, https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex:52025PC0984.

    Amendment

    (41)Regulation (EU) 202X/XXX [on speeding-up environmental assessments] (²⁷) establishes a common acceleration framework for environmental assessments to boost the Union’s roll-out of key technologies, reduce dependencies and increase competitiveness. Procedures linked to environmental assessments should be accelerated and streamlined for plans, programmes and projects across all sectors of the economy while maintaining high levels of protection of human health and the environment. Some sectors may, however, require faster environmental assessments. To ensure the coherence of the legal framework for environmental assessments, while accommodating the need for accelerated deployment in certain strategic sectors, Regulation (EU) 202X/XXX [on speeding-up environmental assessments] establishes a dedicated toolbox. Given their role in ensuring the achievement of the Union’s climate and environmental objectives through their contribution to improving energy efficiency, enabling clean energy integration, and providing the infrastructure needed for smarter grids, transport systems, and low-carbon technologies, and their contribution to the Union’s resilience and economic security by ensuring reliable infrastructure in the Union to protect critical services and strengthening the Union’s capacity to operate independently, data centre projects deployed in acceleration zones should be considered strategic projects within the meaning of Regulation (EU) 202X/XXX [on speeding-up environmental assessments] and therefore benefit from the dedicated toolbox established under that Regulation. Member States should establish an aggregated baseline permit reflecting the specific characteristics of each identified acceleration zone. That aggregated baseline permit issued by public authorities should cover the permits commonly required for such activities within the area, excluding the grid connection permits. That permit should build on the impact analysis carried out for the zone, so that assessments are prepared once by the public authorities rather than repeated by each developer. To make the time limit for individual projects, including the extension or modernisation of existing data centres, effective and predictable, the authorisations required should be processed in parallel, the time limit should start only once the application is complete, and requests for additional information or extensions should be reasoned and limited to what is strictly necessary, in full respect of environmental assessment, public participation and access to justice. Since renewable generation and storage located on site or nearby can supply data centres while grid connections are pending and relieve pressure on the grid, the permits for such facilities should follow the same procedure and time limit.

    27 Add reference to the Regulation on speeding-up environmental assessments once adopted. See Commission proposal COM(2025) 984 final, https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex:52025PC0984.

    Rapporteurs
    Diego Solier and Reinier Van Lanschot
    Group
    Rapporteurs
    Targets
    Recital 41
    Document
    ITRE–IMCO draft report
    Printed header
    Recital 41

Cite

Amendment 11 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), pp. 14–16

https://research.eutechreg.com/trackers/cada/amendments/itre-imco-11/