ITRE–IMCO Amendment 105
Article 10 – paragraph 1 – point a a (new)
105 +Addition Diego Solier +1Rapporteurs · ITRE–IMCO “ensure that each designated zone is supported by firm and verified electricity grid capacity, certified by the competent transmission system operator…” Article 10 – paragraph 1 – point a a (new)
Text proposed by the Commission
Nothing printed in this column.
Amendment
(aa)ensure that each designated zone is supported by firm and verified electricity grid capacity, certified by the competent transmission system operator (TSO) or distribution system operator (DSO), together with a binding timetable for grid reinforcement where additional capacity is required;
- Rapporteurs
- Diego Solier and Reinier Van Lanschot
- Group
- Rapporteurs
- Targets
- Article 10
- Document
- ITRE–IMCO draft report
- Source
- Official text, page 78
- Printed header
- Article 10 – paragraph 1 – point a a (new)
Cite
Amendment 105 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), p. 78