ITRE–IMCO Amendment 105

Article 10 – paragraph 1 – point a a (new)

Document
ITRE–IMCO draft report
Rapporteurs
Diego Solier and Reinier Van Lanschot
  1. 105 Addition Diego Solier +1Rapporteurs · ITRE–IMCO “ensure that each designated zone is supported by firm and verified electricity grid capacity, certified by the competent transmission system operator…” Article 10 – paragraph 1 – point a a (new)

    Text proposed by the Commission

    Nothing printed in this column.

    Amendment

    (aa)ensure that each designated zone is supported by firm and verified electricity grid capacity, certified by the competent transmission system operator (TSO) or distribution system operator (DSO), together with a binding timetable for grid reinforcement where additional capacity is required;

    Rapporteurs
    Diego Solier and Reinier Van Lanschot
    Group
    Rapporteurs
    Targets
    Article 10
    Document
    ITRE–IMCO draft report
    Printed header
    Article 10 – paragraph 1 – point a a (new)

Cite

Amendment 105 (draft report by Diego Solier and Reinier Van Lanschot), European Parliament, Committee on Industry, Research and Energy and Committee on the Internal Market and Consumer Protection, draft report on COM(2026) 502 (CJ18-PR-797430, PE797.430v02-00, 17 November 2026), p. 78

https://research.eutechreg.com/trackers/cada/amendments/itre-imco-105/